Getting ready for piling

Wednesday 7 Oct 2020

The dredged material has been compacted and trimmed to allow piling to commence. A delivery bay plus a crane mat and ramp has been constructed to enable deliveries and plant movements.

The crane, piling rig and piles are being delivered to allow piling to start on the ALB ramp down onto the beach to the north of the sea defences.

 

Northerly gale

Northerly gale
25/9/20 MP

Northerly gale

Northerly gale
25/9/20 MP

Restored Liverpool-class lifeboat 'Lucy Lavers' passing the gap in the sea defences where the ALB ramp will be

Restored Liverpool-class lifeboat 'Lucy Lavers' passing the gap in the sea defences where the ALB ramp will be
1/10/20 MP

The site ready for the arrival of the crane and piling equipment

The site ready for the arrival of the crane and piling equipment
1/10/20 Macley

Crane arriving on-site

Crane arriving on-site
2/10/20 Mackley

Business as usual: the lifeboat is recovered after an exercise on the beach to the east of the building site

Business as usual: the lifeboat is recovered after an exercise on the beach to the east of the building site
4/10/20 MP

Piling materials arriving on site

Piling materials arriving on site
6/10/20 RW

Plant and materials ready for start of piling for the ramp to the north

Plant and materials ready for start of piling for the ramp to the north
6/10/20 RW