Wells new Shannon boathouse
Wells Boathouse Build

New boathouse build

  Newer post...
Older post...  

First piles driven into beach

Sunday 11 Oct 2020

The crane and piling rig have arrived and been setup on site, followed by tubular pile deliveries. ALB ramp piling started on 9 October to the north of the gabions, with three piles installed and a few more hours left on the tide to install some more.

The ramp piling will continue next week working around the tides, with continued deliveries up to half term.

 

Main site, with steel piles ready for the ramp

Main site, with steel piles ready for the ramp
7/10/20 Mackley

Piling rig in place on the beach for piling with the crane passing the tubular steel piles over the sea defences

Piling rig in place on the beach for piling with the crane passing the tubular steel piles over the sea defences
9/10/20 MP

First pile for the ramp being driven into the beach

First pile for the ramp being driven into the beach
9/10/20 MP

First pile for the ramp being driven into the beach

First pile for the ramp being driven into the beach
9/10/20 Mackley

First pile for the ramp being driven into the beach

First pile for the ramp being driven into the beach
9/10/20 MP

And onto the second...

And onto the second...
9/10/20 Macley