Piling has remained difficult but was finally completed today with the last tubular pile installed and a remaining few that needed to be driven down level.
Work will now proceed with derigging the crane and arranging for it to be transported away along with the piling rig and hammers. Attention will then switch to completing the ILB ramp and preparing for concrete to be poured, and to final fill and grading on the building area to allow drainage works to start.
Saturday 20 Feb 2021
Steelwork completed for ALB ramp
Friday 12 Feb 2021
Winter weather and the ALB ramp
Friday 29 Jan 2021
Drainage and service ducts installed
Friday 22 Jan 2021
Works restart after Christmas
Sunday 20 Dec 2020
Ready for Christmas
Monday 30 Nov 2020
Piling completed
Friday 20 Nov 2020
Installing piles for the main building
Monday 9 Nov 2020
Aerial site views
Sunday 1 Nov 2020
Sheet piling continues
Sunday 25 Oct 2020
Start of sheet piling the ILB ramp