Work starts on roof

Monday 2 Aug 2021

Scaffolding has been erected on the west side of the building and a start made on the roof for the new boathouse. This is the area where the ILB will be kept and the gift shop and public engagement space in the new building. The first timber sections of roof have been constructed... these are effectively the interior or underside of the roof which will eventually be clad in a weatherproof material over the top of the planks.

 

Scaffolding being erected on the west side of the building

Scaffolding being erected on the west side of the building
23/7/21 RW

Scaffolding on the west side of the building with frame for public viewing gallery visible on left

Scaffolding on the west side of the building with frame for public viewing gallery visible on left
23/7/21 RW

Scaffolding erected on west side of building

Scaffolding erected on west side of building
23/7/21 RW

Interior roof for gift shop and ILB shed in place

Interior roof for gift shop and ILB shed in place
30/7/21 RW

New roof in place over gift shop and ILB shed

New roof in place over gift shop and ILB shed
30/7/21 RW

Timber roof in place for ILB shed

Timber roof in place for ILB shed
30/7/21 RW

Timber roof in place for ILB shed

Timber roof in place for ILB shed
30/7/21 RW

Timber roof viewed from inside

Timber roof viewed from inside
30/7/21 RW

Timber roof in place over ILB shed and gift-shop/engagement space

Timber roof in place over ILB shed and gift-shop/engagement space
30/7/21 RW